Experience

  • GEOTHERMAL - We have installed over 600 vertical loop installations throughout Wisconsin. The projects ranged from 4 loop residential projects to 220 loop commercial projects with 1.0 btu/hr. grout.
  • We were instrumental in developing the new arsenic drilling guidelines. These drilling protocols solved the rising arsenic levels in new wells in Northeastern Wisconsin. We have drilled hundreds of wells to the new WDNR arsenic standards with excellent results.
  • Set 20" Casing to 105ft., drilled 20" borehole to 500ft, Set 16" Casing to 500ft., drilled 16" finished hole to 1150ft. (straight well)
    Bellevue, WI (Foth & Van Dyke Inc.)
  • Set 20" Casing to 100ft., drilled 20" borehole to 485ft., Set 16" Casing to 485ft., drilled 16" finished hole to 790ft. (straight well)
    Lawrence, WI (Foth & Van Dyke Inc.)
  • Set 18" Casing to 105ft., drilled 18" borehole to 487ft., set 12" Casing to 487ft., drilled 12 finished hole to 785ft. (straight well)
    Suamico, WI Harbor Lights
  • Set 18" Casing to 70ft., drilled 18" borehole to 455ft., set 12" Casing to 426ft., 12" finished hole to 813ft. (straight well)
    Hobart, WI (Foth & Van Dyke Inc.)
  • Set 18" Casing to 67ft., drilled 18" borehole to 425ft., set 12" Casing to 426ft., drilled 12" finished hole to 743ft. (straight well)
    Suamico, WI (Foth & Van Dyke Inc.)
  • Set 22" Casing to 85ft., drilled 22" borehole to 380ft., set 16" Casing to 380ft., drilled 16" finished borehole to 1553ft. (straight well)
    Burlington, WI (Crispell-Snyder Inc.)
  • Set 22" Casing to 55ft., drilled 22" borehole to 320ft., set 16" Casing to 320ft., drilled 16" finished borehole to 1504ft. (straight well)
    Burlington, WI (Crispell-Snyder Inc.)
  • Set 24" Casing to 20ft., drilled 24" borehole to 395ft., set 18" Casing to 395ft., drilled 18" finished borehole to 795ft. (straight well)
    Blue Mound, WI (CTW Inc.)
  • Set 12" Casing to 185ft., drilled 12" borehole to 1150ft. (straight well)
    Wales, WI (CTW Inc.)
  • OTM well setting 350 ft. of 8" Casing and final well depth of 430 ft. This well was constructed to the ARSENIC STANDARDS outlined by the WDNR. (straight well)
    Town of Grand Chute, WI
  • OTM well setting 315 ft. of 8" Casing and a final well depth of 325 ft. This well was drilled with casing hammer methods and was finished in a sand/gravel aquifer. (straight well)
    Town of Wolf River, WI
  • Over 10,000+ 6" residential wells from 50 feet to 1200 feet
  • Numerous boreholes for construction up to 36" diameter
  • Grounding rods for towers
  • Numerous Pump Installations
  • Numerous Pump Tests
  • Directional Drilling to 1000 feet
  • High capacity wells to 4000gpm
  • Arsenic construction specialists
  • eothermal Loop Installations

Visit EDS Services our drilling company dedicated to drilling for environmentally sensitive sites.